Back to roadmap
Milestone 5 of 5
In progress 🎯 Target ()

Venue Zoning & Physical Production

Lock stall allocations, safety hazard layout checks, and print signage.

1 of 4 steps done
25%
Table of Contents

Milestone Goal

Finalize the floor map layout, print all directional and sponsor signage, allocate stalls to selected makers, and verify safety protocols.

Action Steps

  • Venue Finalised: The venue is finalised as Chakkolas; only the two godown spaces will be used, with the outer area kept for parking.
  • Stall Allocation: Assign physical booths based on maker utility lists (such as ventilation needs for laser cutters/soldering stations).
  • Safety Clearances: Inspect power distribution blocks, coordinate smoke exhausts, and secure municipal/fire department permits.
  • Print Collaterals: Lock dimensions and design files with the printing vendor for stage backdrops, directional posters, and badges.

Discussed in

✏️ Update milestone πŸ•˜ History
Jump to

Tip: search for people, places or topics. Use the tabs to narrow down to minutes, wiki pages or milestones.