Milestone Goal
Finalize the floor map layout, print all directional and sponsor signage, allocate stalls to selected makers, and verify safety protocols.
Action Steps
- Venue Finalised: The venue is finalised as Chakkolas; only the two godown spaces will be used, with the outer area kept for parking.
- Stall Allocation: Assign physical booths based on maker utility lists (such as ventilation needs for laser cutters/soldering stations).
- Safety Clearances: Inspect power distribution blocks, coordinate smoke exhausts, and secure municipal/fire department permits.
- Print Collaterals: Lock dimensions and design files with the printing vendor for stage backdrops, directional posters, and badges.