• 7 min read

Fundraising, Venue Layout & Curation Planning Call

Reviewed sponsorship status and the new ~50 lakh starting tier, agreed to use only the two godowns, and kicked off maker curation with daily 8:30 PM syncs.

Date
Time
8:30 PM – 9:30 PM IST
Where
Google Meet
Format
💻 Online
5 attendees
Samad Kurian Abhiram Salman Faris Jasim CM

🤖 AI-assisted minutes: notes and minutes in this section are drafted with the help of AI and reviewed by the team. Please flag any errors or omissions.

✅ 11 action items · 11 open Jump to action items ↓
Table of Contents

Agenda

  • Fundraising and sponsorship status
  • Venue, layout and design direction
  • Program, curation and content planning
  • Marketing, social and media outreach
  • Decisions and daily coordination

Discussions & Key Decisions

1. Fundraising & Sponsorship Status

Solid leads so far: Starter Machine and TinkerHub (TinkerHub was mentioned as confirmed).

  • Starter Machine: Handling venue coordination directly with Chakkolas, with the advance/payment process running in parallel. The event is positioned officially under Starter Machine’s umbrella and program naming (public-facing submission and program references were mentioned).
  • Singapore-based fundraising group (India presence, Calicut subsidiary): will approach companies with marketing budgets. Commission is 10% of funds raised.
  • Dubai-based design/architecture network (linked to design firms and institutes around Calicut and Wayanad): will not raise funds directly, but can introduce good potential sponsors.
  • Sponsorship tiers: The earlier tiers (13 / 15 / 20 lakhs etc.) were judged ineffective. A new proposal with different slabs has been created, starting at ~50 lakhs, and is being shared with the team (Susan and others).

📌 Fundraising blockers

The fundraising team needs two things before they can pitch properly: (1) a clear 2-day event schedule/agenda and (2) a sponsor branding inventory showing where logos appear (stage backdrop, standees, ID cards, venue placements, etc.).

2. Venue, Layout & Design

📌 Venue finalised

The venue is finalised as Chakkolas.

📌 Decision

Use only the two godown/warehouse spaces for the event setup. The outer area is kept mainly for parking. This reduces cost and avoids expensive structures and finishes such as premium hangars.

  • Cost reference: Another architecture/design community event at the same venue reportedly spent 60–70 lakhs in total. Air-conditioning alone was ~15 lakhs and cooling was still insufficient.
  • Measurements: That event’s drawings and measurements will not be shared. If an existing set cannot be obtained from the venue or others, a survey team will be arranged for fresh baseline measurements.
  • Design: Asif will produce a base venue design and zoning draft. An early estimate was 2–3 days; later discussion pointed to design refinement by next weekend.
  • Interactive layout visualization (Abhiram): The existing concept lets users click an area (workshops, community space, etc.) to see details. It will be reworked to the new measurements and final zoning, and is useful for sponsor communication (branding placement and program zones).

3. Program, Curation & Content Planning

Program clarity for fundraising: Enough of the program needs to be locked to support pitches: keynotes, inauguration and closing, number and type of sessions, and a possible cultural/art performance (relevant for pitches to government bodies such as KTDC).

Curation approach: Start curation now without waiting for exact stall or workshop counts.

  • Expected scale: about 40–50 workshops and 10+ stalls, with flexibility for day-1-only or day-2-only participants.
  • Spaces: Student space, Hobbyists (the “HBC/OBC” reference was unclear and is treated as the hobbyist/community segment), and Startup/Tech space.
  • Support for participants: The current budget covers food on event days. Accommodation and travel are not covered, but may be considered if fundraising improves.

Maker database and tools

  • Master list of ~1,500 makers, with ~298 emails currently available. A separate mention said 198 emails were used for the blast, so this needs reconciling.
  • An email blast inviting makers to showcase projects has gone out, with ~6 bounces.
  • The internal web tool has spaces, rough schedules and 26 main-stage sessions across both days (a projection, not confirmed). It is not public yet (email restriction in place) and is planned to open 1–2 weeks before the event. Teams and entries are tagged, and clicking one shows the full profile.

Curation workflow: Create a “Curated” sheet/tab derived from the master database, with these fields:

  • Reference/Record ID
  • Category fit (workshop / exhibit / talk)
  • City/state
  • Website, email and socials
  • Reviewer/owner (“On-by”)
  • Outreach status
  • Notes
  • Last update

Ownership is assigned through “On-by” so multiple people do not duplicate outreach.

4. Marketing, Social & Media Outreach

  • Content strategy: Move beyond repetitive posters to short explainer videos and reels. Publish clear public messaging covering hands-on exhibits, workshops, talks and panels, and who the event is for (students, hobbyists, engineers, etc.).
  • Media outreach: A media outreach sheet exists in the Drive. Featuring selected makers and projects in media before the event can build momentum.
  • Amplification: Ask known creators and accounts to post, reshare or collab on posts announcing the event. Raw, simple content is acceptable and brand guidelines are optional.

5. Decisions & Agreements

  • Daily sync: The team meets daily at 8:30 PM (PM implied in the recording) to keep curation and outreach moving.
  • Start curation now: Initial working target of ~200 individual makers + ~100 organizations.
  • Outreach flow: Start with a short DM or message, then follow up with an official email if needed, especially for organizations.

Action Items

Action ItemAssigneeDeadlineStatus
Prepare and share a clear 2-day event schedule (keynote, inauguration, closing, session blocks), using the draft in the web toolSalman + core teamNext syncPending
Create sponsor branding inventory (stage backdrop, standees, ID cards, zones) aligned to the latest layoutAsif & Salman & AbhiramNext syncPending
Share updated sponsorship slabs (from ~50L) with the wider team and keep outreach consistentSalmanNext syncPending
Arrange a basic measurement survey of the two godowns if measurements can’t be obtainedAsifNext syncPending
Deliver base venue zoning/layout draft (workshops, stalls, community spaces, main stage, talk areas)AsifNov 29, 2026Pending
Rework interactive layout visualization to new measurements and final zoning for the sponsor pitchAbhiramAfter measurementsPending
Create/standardize the “Curated” sheet with On-by, outreach status and reference IDsSalmanNext syncPending
Begin manual review and outreach from top-ranked makers; mark On-by to avoid duplicationAll curation teamOngoingPending
Draft standard DM and email templates (exhibit / workshop / talk invitation; food only, travel and stay conditional)SalmanNext syncPending
Update and reshare the Instagram account list and social amplification plan in the groupJasim CMNext syncPending
Identify 5–10 makers/projects to feature in media early; add to media sheet and start outreachMedia outreach volunteers & SalmanNext syncPending

Timeline & Next Steps

  • Daily sync, 8:30 PM: Review outreach progress, update Curated sheet statuses, and iterate the schedule and layout for sponsor readiness.
  • Next weekend: Refined venue design and zoning from Asif.
  • Before sponsor pitches: 2-day schedule, branding inventory and the updated slabs must be ready.

ℹ️ Open items

  • Confirm the exact number of emails used in the blast (198 vs 298).
  • Confirm the program elements needed for sponsor pitches: keynotes, inaugural/closing segments, cultural performance, front-row seating and premium sponsor perks.
  • Confirm Drive and internal tool access permissions for all relevant team members.

Related meetings

✏️ Edit minutes 🕘 History
Jump to

Tip: search for people, places or topics. Use the tabs to narrow down to minutes, wiki pages or milestones.