• 2 min read

Venue Site Visit & Layout Planning

Walkthrough of the proposed event venue, layout discussions, parking assessment, and logistics planning.

Date
Time
4:30 PM
Where
Event venue (site visit)
Format
πŸ“ In person
8 attendees
Abhiram Samad Shaan Midlaj Jasim Jaseel Salman Anin

πŸ€– AI-assisted minutes: notes and minutes in this section are drafted with the help of AI and reviewed by the team. Please flag any errors or omissions.

βœ… 3 action items Β· 0 open Jump to action items ↓
Table of Contents

Agenda

  • Visit and review the venue for Maker Faire
  • Discuss potential event layout and usage of spaces
  • Assess parking and next steps for venue finalization

Discussions & Key Decisions

1. Venue Walkthrough

The team met with the venue manager and conducted a full walkthrough of the venue grounds, available open-air structures, and storage warehouses (go-downs) that can be utilized.

  • The venue manager indicated that a CAD drawing of the entire site layout is available and will be shared.

2. Initial Layout Planning

The team discussed baseline parameters for space distribution. Designs will be adapted to fit:

  • Existing permanent structures (which reduces staging build costs).
  • Open space distribution to facilitate comfortable foot traffic.

3. Parking Assessment

Parking feasibility was determined to be excellent, with an estimated capacity of 2,000–3,000 cars. Allocating specific parking zones and entry/exit points will be essential to ensure smooth vehicle flow.


Action Items

  • Obtain and review the CAD drawing from the venue manager - Abhiram - May 5, 2026
  • Identify and finalize usable warehouse sections (go-downs) for stalls - Samad & Shaan - May 8, 2026
  • Draft a preliminary parking zone plan - Midlaj - May 10, 2026

Related meetings

✏️ Edit minutes πŸ•˜ History
Jump to

Tip: search for people, places or topics. Use the tabs to narrow down to minutes, wiki pages or milestones.