Agenda
- Content plan and formats
- Content scheduling and pipeline
- Collaborations and creator outreach
- Curation and outreach workflow (Google Sheets)
- Venue layout update
- Sponsorship and proposals
- Partner onboarding tracking
Discussions & Key Decisions
1. Content Plan & Formats
Three content formats can be produced quickly:
- Short-form videos (15–30 seconds)
- Carousel posts, either project-focused or from a “maker profile” angle
- Event updates and quick posts (motion posters, basic announcements)
“Human touch” content (people speaking, creators featured) is likely to get better reach than posters alone. Faces and hosts will be rotated to avoid overexposure (for example alternating Jasim, Abhiram and others), and other accounts such as “Tinker Dot Malayalam” can be used too.
2. Content Scheduling & Pipeline
A proper schedule/content calendar is needed, driven by:
- A list of partner communities and teams (e.g. MakerGram, TinkerHub and related partners)
- A pipeline for welcoming and onboarding new communities and featuring what they do
A “Road to Maker Faire Kochi” idea was also discussed: roadshows or flash activations in major cities such as Trivandrum, Kochi and Calicut.
3. Tinkercad Access Constraint
The tool is account-based, so sharing access is difficult without access to the account email. Workaround: use the tool directly on the machine/browser session, with limited access for a single person (Akshay).
4. Collaborations & Creator Outreach
- “Explain the Planet”-style collaboration: a video on Kerala’s maker culture with a call to action for Maker Faire.
- “Malayali.info”-style collaboration (similar category).
- Calicut short-form content: a proposal to produce about 10 reels in a week around Calicut makers. Limits need to be realistic since this is early stage.
- Coders Cafe (Kannur): another creator with strong reach (a chicken coop video performed well). More such creators will be identified and routed through Samad for outreach.
5. Curation & Outreach Workflow (Google Sheets)
Two sheets are in use:
- “Raw Maker Faire” sheet: a compiled dump with scoring and fields, prepared by Abhiram using an agent/workflow and then structured.
- “Curator List” sheet: the working shortlist, with individuals and organizations separated.
Goal: select about 200 makers/organizations from the raw list into the Curator List.
Workflow:
- Review the candidate’s profile (Instagram, LinkedIn or portfolio).
- If aligned, add to the Curator List using the unique Maker ID.
- DM or message as a Maker Faire representative, inviting them to participate or present.
- Update the status in the sheet and assign an Owner (who reached out).
Not all entries have an email. Outreach may start on social media, with the email collected afterwards.
Sheet improvements:
- Add a “Last Contacted On” / “Last Updated” column, automated with a timestamp function tied to status edits.
- The Owner field already exists, which prevents overlap and duplicate claiming.
- Avoid duplicating full data across sheets: copy only name and Maker ID into the Curator List.
6. Venue & Layout Update
- The layout has not been received yet.
- Salman will follow up with Asif and share an update in the group.
- Asif will be brought into calls starting tomorrow for faster alignment.
7. Sponsorship & Proposals
- Key-value sponsors: a proposal at 15L was shared for an “Associated Sponsor” concept, with a student vertical sponsorship discussed.
- Jain group: discussions happened and a proposal will be sent. Expectations should stay low, since they are running their own conference/media conclave and building their own properties.
- Arduino: pitch as Title Sponsor. Naming options:
- “Arduino Maker Faire Kochi”, or
- “Maker Faire Kochi presented by Arduino”
- Qualcomm/hackathon angle: mentioned as a possible pitch route.
- Some sponsor conversations need layout details (e.g. Karthik and others asked).
📌 Decision
Proceed with the Arduino title sponsor pitch. Finalize the draft after internal review and send it promptly.
8. Partner Onboarding Tracking
There is no formal partner onboarding flow today. A dedicated “Partners” sheet will list all existing partners, mapped by domain/type. When a partner is onboarded, the media team will be pinged so content and features can be planned.
9. Decisions & Agreements
- Focus on short-form, carousel and human-led content for better reach.
- Use a structured Google Sheets curation workflow to shortlist about 200 makers/organizations and track outreach ownership and status.
- Use the Owner approach to prevent duplicated outreach, and add a “Last Contacted/Updated” timestamp.
- Create a Partners sheet, and make partner onboarding trigger a media-team ping.
- Proceed with the Arduino title sponsor pitch, finalizing the draft in the next working session.
Action Items
| Action Item | Assignee | Deadline | Status |
|---|---|---|---|
| Prepare a list of partner communities/teams to feed the content calendar | TBD | Next sync | Pending |
| Incorporate the partner list into a content calendar | TBD | Next sync | Pending |
| Build a content pipeline for welcome/onboarding posts as new communities and individuals join | Media/content team | Next sync | Pending |
| Continue shortlisting makers/orgs from “Raw Maker Faire” into “Curator List” until ~200 are selected | All curators | Ongoing | Pending |
| Use the unique Maker ID when transferring to the Curator List; avoid duplicating full data | Abhiram & curation team | Ongoing | Pending |
| Ensure every shortlisted entry has an assigned Owner before outreach | All curators | Ongoing | Pending |
| Add a “Last Contacted On / Last Updated” timestamp column (automated) | Abhiram | Next sync | Pending |
| Coordinate outreach to creators/influencers; others route leads to Samad | Samad | Ongoing | Pending |
| Continue the “Explain the Planet” collaboration (Kerala maker culture video + CTA) | TBD | Next sync | Pending |
| Proceed with the Calicut short-form plan (up to 10 reels/week, with realistic limits) | Jasim | Next sync | Pending |
| Follow up on layout status, call Asif and update the group; arrange a survey visit if needed | Salman | Next sync | Pending |
| Add Asif to future calls starting tomorrow | TBD | Nov 24, 2026 | Pending |
| Finalize the Arduino title sponsor pitch draft and send the email | TBD | Nov 24, 2026 | Pending |
| Send the Jain proposal, keep expectations conservative and track the response | TBD | Next sync | Pending |
| Prepare to pitch additional sponsors (e.g. Qualcomm) once the layout is available | TBD | After layout | Pending |
| Create a “Partners” Google Sheet, populate existing partners and map them by domain/type | Abhiram | Next sync | Pending |
| Notify the media team whenever a partner is onboarded | Partnerships/curation coordinators | Ongoing | Pending |
Timeline & Next Steps
- Tomorrow, around midday: working session to finalize and send the Arduino sponsorship draft.
- Tomorrow: Asif joins the calls.
- Additional call around 5:00–5:30: context unclear; make sure a calendar invite is circulated.
- Layout: blocks some sponsor conversations until it arrives.
ℹ️ Open items
- Final event layout/venue map is pending.
- Confirm who owns ongoing partner onboarding admin (entering partner details in the Partners sheet).
- Confirm the content calendar owner and timeline for the first 2–4 weeks of posts.
- Confirm the final Arduino naming (Title vs Presented By) after internal alignment.